Project management
  • Pre-construction: Final design, selection of equipment and materials, assessment and collection of EPC, contract creation and evaluation.
  • Construction: Project supervision during the construction phase according to the technical specifications and deadlines.
  • Inspection & Delivery Period: Initial and continuous inspection during the first operation period of the park, until the project is fully delivered.

THE PARKS

THE PARK IN DALI

Dali is a grid connected Photovoltaic Plant Project with nominal power of 1,5MWp, in Cyprus.

There are 5773 PV modules RECOM Amur Leopard RCM-260-6PB, with a power of 260Wp each installed, which provide energy to 28 inverters ABB TRIO-50TL-OUTD-400-SX.

The ALUMIL HELIOS H2100-189-P-25 mounting system supports the PV modules at 25ο and provides a solid base for the entire system. The two poles are fixed on terrain through bored piles with concrete.

For every year of its operation it is estimated that this plant will save about 1.800 tones CO2,  equivalent to CO2 emmisions of 800 cars.

The park is funded by EBRD – The European Bank for Reconstruction and Development (EBRD)

 

THE PARK IN NISOU

Nisou is a grid connected Photovoltaic Plant Project with nominal power of 1,5MWp, in Cyprus.

There are  5770 PV modules RECOM Amur Leopard RCM-260-6PB-SW of 260Wp each installed, and they provide their energy to 28 inverters ABB TRIO-50TL-OUTD-400-SX.

The ALUMIL HELIOS H2100-189 mounting system will support the PV modules at 25ο and it will provide a solid base for the entire system. The two poles has been fixed on terrain through bored piles with concrete.

For every year of its operation, it is estimated that this plant will save about 1.800 tones CO2 , equivalent to CO2 emissions of 800 cars .

The park is funded by EBRD – The European Bank for Reconstruction and Development (EBRD)

THE PARK IN FRENAROS

Frenaros is the biggest grid connected Photovoltaic Plant Project in Cyprus with nominal power of 4.4 MWp.

They will be installed 12.756 PV modules RECOM Amur Leopard RCM-345-6MA-SW of 345Wp each, and they will provide their energy to 85 inverters ABB TRIO – 50.0 – TL-OUTD.

The ALUMIL HELIOS H2100-189 mounting system will support the PV modules at 25ο and it will provide a solid base for the entire system. The two poles has been fixed on terrain through bored piles with concrete.

The implementation of this PV park offers multiple social and environmental benefits. The shifting to ‘green’ generated energy opens additional jobs on the island and makes a significant contribution to protecting the environment.

The PV park in the Frenaros area is estimated to save about 5,500 tons of CO2 per year, equivalent to CO2 emissions of 2,400 cars per year. Also, more than 1,500 households in the area are powered by the PV Park.

The GDL Green Energy Group, with the completion of this PV Park, the largest in Cyprus, is implementing its vision of big energy investments in Cyprus using photovoltaics and strengthens its strong commitment in this direction by making even greater investments in the near future.

The park is funded by EBRD – The European Bank for Reconstruction and Development (EBRD)